Corpuls pre-shift check procedure

ECG Stock Photo

Please find the below Corpuls pre-shift check procedure: 

  1. Turn the test box on
  2. Turn the Corpuls on
  3. Plug the test box into the Corpuls
  4. A message will appear 'Mark mission as test mission' - press 'Yes'
  5. Connect 4-pole ECG leads to the test box
  6. Press 'Manual' on theCorpuls
    1. The top lead will show as lead 'II' and show a waveform (if no waveform, change / check the leads)
    2. Charge at 200j and deliver a shock
  7. Remove the 4-poleECG cables from the test box
    1. The top lead will show 'DE' and show a waveform (if no waveform, check the test box / batteries)
    2. Charge at 200j and deliver a shock
  8. Turn the Corpuls and test box off

All shocks delivered must be within ± 10% (180j - 200j)

The Corpuls pre-shift check procedure can also be downloaded as a PDF below. 

Published 19th August 2020

Downloads


0 Comments
Leave a Comment
Name (required)
Email Address (required, never displayed)
Enter a message

(all comments are moderated - your submission will be posted on approval.)